hotline:
010-53033961
EN
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
China Southern Airlines Hangar Project at Daxing New Airport
time:2019-01-22
hits:5299次
source:正弘奥能
<p> <br /> </p> <p> <span line-height:2;"="" style="font-size: 16px;"><strong>Project Name: </strong>China Southern Airlines Hangar Project at Daxing New Airport<strong><br /> <br /> <br /> Project Location: </strong></span><span style="font-size:16px;">Daxing District, Beijing</span> </p> <p> <span line-height:2;"="" style="font-size: 16px;"><strong><br /> <br /> Project Overview:</strong> Hangar No. 1 of China Southern Airlines Base at Beijing's new airport has a total area of 39,000 square meters, which is equivalent to 5 football fields or 80 basketball courts. It consists of a maintenance hangar hall and a four-story annex building. It is designed to accommodate five wide-body aircraft and three narrow-body aircraft, which can amount to twelve aircraft including two Airbus A380 and three Boeing 777 at the same time. This design can meet the flexibility of parking aircraft of different models and different maintenance requirements. The project is the largest single-unit project in the China Southern Airlines base at Beijing's new airport. After its completion, it will become one of the largest aircraft maintenance hangars in Asia and in the world. (Citation: China Southern Airlines official website news announcement)<br /> </span> </p> <p> <span line-height:2;"="" style="font-size: 16px;"><strong></strong></span> </p> <p> <span line-height:2;"="" style="font-size: 16px;"></span><br /> <span line-height:2;"="" style="font-size: 16px;"><strong>Project Features: </strong></span> </p> <p> <span line-height:2;"="" style="font-size: 16px;">1. Large-span, high-rise hangar</span> </p> <p> <span line-height:2;"="" style="font-size: 16px;">2. Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span><br /> <span line-height:2;"="" style="font-size: 16px;">3. Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span> </p> <div style="text-align:center;"> </div> <span line-height:2;"="" style="white-space: normal; font-size: 16px;">4. Spacious building and higher temperature requirement, needing faster heating rate</span> <p> <br /> </p> <p> <span line-height:2;"="" style="white-space: normal; font-size: 16px;">5. Doors open frequently, and the intrusion of cold wind consumes a lot of heat.</span> </p> <p> <span style="font-size:16px;">6. The hangar is mainly used for airplane maintenance, therefore requiring more safety concerns.<br /> </span><br /> <span line-height:2;"="" style="white-space: normal; font-size: 16px;"><strong>Equipment Usage:</strong>We have chosen 84 sets of IMPRESIND Tub-One gas-fired radiant heating products for this project. The project is currently under early-phase construction. <br /> </span><span></span> </p> <p> <br /> </p> <p style="text-align:center;"> <span line-height:2;"="" style="font-size: 16px;"><img src="http://www.leadwaypower.com/Uploads/image/20190418/20190418191101_66977.jpg" alt="" /></span> </p> <p style="text-align:center;"> <img src="http://www.leadwaypower.com/Uploads/image/20190418/20190418191101_97495.jpg" alt="" /> </p> <div style="text-align:center;"> <img src="http://www.leadwaypower.com/Uploads/image/20190418/20190418191102_41387.jpg" alt="" /> </div> <p style="text-align:center;"> <img src="http://www.leadwaypower.com/Uploads/image/20190412/20190412171053_74094.jpg" alt="" /> </p> <div style="text-align:center;"> <img src="http://zhan.w72.mc-test.com/Uploads/image/20190412/20190412171102_62363.jpg" alt="" /> </div> <p> <br /> </p>
prev:Airplane Hangar Project of Xinjiang Urumqi Aviation Production & Operation Base
Returns a list of
next:China Eastern Airlines Hangar Project at Daxing New Airport