hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
China Eastern Airlines (Beijing) Airplane Maintenance Depot
time:2019-01-22
hits:12526次
source:正弘奥能
<p> <span font-size:16px;line-height:2;"="" style="font-size: 16px;"><span style="line-height:2;font-size:16px;"><strong>Project Name: </strong>China Eastern Airlines(Beijing) Airplane Maintenance Depot</span></span> </p> <p> <span font-size:16px;line-height:2;"="" style="font-size: 16px;"><span style="line-height:2;font-size:16px;"><strong>Project Location: </strong></span></span><span style="font-size:16px;"></span><span style="font-size:16px;">Beijing Capital International Airport</span> </p> <p> <span font-size:16px;line-height:2;"="" style="font-size: 16px;"><span style="line-height:2;font-size:16px;"><strong>Project Overview: </strong>The support base project of China Eastern Airlines(Beijing) is one of the key construction projects of China Eastern Airlines in Beijing. The project is located in the 26th block of Shunyi District, Beijing, with its eastern border extending the airport's north line, and its southern border extending to No.3 road in the bonded functional zone. To its west is the planned road and to its north is the south side road of the airport's north line. The planned area is 44.014 mu, of which 79,226 square meters above ground and 34474.2 square meters underground. The total investment of the project is about 720 million yuan. The maintenance depot is the focus of the project. (Citation: CNR, "The base project of Beijing Branch of China Eastern Airlines officially launched")</span></span> </p> <p> <br /> </p> <p> <strong><span style="font-size:16px;">Project Features: </span></strong> </p> <p> <br /> </p> <p style="color:#333333;font-family:arial, "font-size:14px;text-align:justify;background-color:#FBFBFB;"> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box; font-size: 16px;"><span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box; line-height: 2;">1. <span style="font-family:arial, "font-size:16px;background-color:#FBFBFB;">Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span></span></span> </p> <p style="color:#333333;font-family:arial, "font-size:14px;text-align:justify;background-color:#FBFBFB;"> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box;"><span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box; line-height: 2; font-size: 16px;">2. <span style="font-family:arial, "font-size:16px;background-color:#FBFBFB;">Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span></span><br /> <span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box; line-height: 2; font-size: 16px;">3.<span style="font-family:arial, "font-size:16px;background-color:#FBFBFB;"> Doors open frequently, and the intrusion of cold wind consumes a lot of heat.</span></span><br /> <span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box; line-height: 2; font-size: 16px;">4.<span style="font-family:arial, "font-size:16px;background-color:#FBFBFB;">The maintenance depot is mainly used for airplane maintenance, therefore requiring more safety concerns.</span></span></span> </p> <p style="color:#333333;font-family:arial, "font-size:14px;text-align:justify;background-color:#FBFBFB;"> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box;"><span><span style="font-size:16px;"><br /> </span></span><span font-size:16px;line-height:2;"="" style="margin: 0px; padding: 0px; outline: none; list-style: none; box-sizing: border-box;"><span style="line-height:2;font-size:16px;"><strong>Equipment Usage:</strong><span style="font-family:arial, "font-size:16px;background-color:#FBFBFB;">We have chosen 10 sets of IMPRESIND Tub-One gas-fired radiant heating products for this project, which effectively demonstrates the advantages of high-power gas radiant heating equipment in large spaces.</span></span></span></span> </p> <p> <br /> </p> <p> <span font-size:16px;line-height:2;"=""></span> </p> <p style="text-align:center;"> <span font-size:16px;line-height:2;"=""><span style="line-height:2;font-size:16px;"><img src="http://www.leadwaypower.com/Uploads/image/20190401/20190401105252_74201.jpg" width="700" height="394" alt="" /><br /> </span></span> </p> <p style="text-align:center;"> <span font-size:16px;line-height:2;"=""><span style="line-height:2;font-size:16px;"><img src="http://www.leadwaypower.com/Uploads/image/20190401/20190401105311_46677.jpg" width="700" height="394" alt="" /><br /> </span></span> </p> <p style="text-align:center;"> <span font-size:16px;line-height:2;"=""><span style="line-height:2;font-size:16px;"><img src="http://www.leadwaypower.com/Uploads/image/20190401/20190401105331_90950.jpg" width="700" height="394" alt="" /></span></span> </p>
prev:China Southern Airlines' Shenyang Airplane Maintenance Base No. 2 Hangar Renovation Project
Returns a list of
next:STAECO(Rizhao) Aircraft Engineering Co., Ltd. Project