hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
China Eastern Airlines Hangar Project at Daxing New Airport
time:2019-01-22
hits:6478次
source:正弘奥能
<p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span font-size:16px;line-height:2;"=""><span style="line-height:2;font-size:16px;"><strong>Project Nam<strong>e</strong></strong><strong>:</strong> </span><span style="line-height:2;"></span><span style="line-height:2;font-size:16px;">China Eastern Airlines Hangar Project at Daxing New Airport</span><span style="line-height:2;"><br /> <span style="font-size:16px;"><strong>Project Location:</strong></span> <span style="font-size:16px;">Daxing District, Beijing</span></span></span></span><span style="font-size:16px;"></span> </p> <p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span font-size:16px;line-height:2;"=""><span style="line-height:2;"><span style="font-size:16px;"> <strong>Project Overview: </strong></span><span style="font-size:16px;">Beijing Daxing International Airport Eastern Airlines Base Maintenance and Special Vehicle Maintenance Area Phase I Project, with a total construction area of 85,400 square meters, includes 15 stand-alone buildings such as a hangar and its annexes, business buildings, aviation materials warehouses, and North District Energy Power Center. The hangar in the north area has a total construction area of 28,000 square meters, which is the largest single-unit project in the China Eastern Airlines base. It consists of a maintenance hangar hall and a four-story annex building. It is designed to accommodate two wide-body aircraft or three narrow-body aircraft, which may allow two Boeing 747 or three Boeing 777 to be parked at the same time. This design can meet the flexibility of parking aircraft of different models and different maintenance requirements. (Citation: Xinhua Net, "Hangar of Beijing Daxing International Airport Eastern Airlines Base officially capped")</span></span></span></span> </p> <p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="font-size: 16px; line-height: 2;"><strong>Project Features:</strong></span></span> </p> <p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"="" style="font-size: 16px;"><span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="line-height: 2; font-size: 16px;">1. <span style="color:#333333;font-family:arial, "font-size:16px;background-color:#FBFBFB;">Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span></span></span> </p> <p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="line-height: 2; font-size: 16px;">2. <span style="color:#333333;font-family:arial, "font-size:16px;background-color:#FBFBFB;">Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span></span><br /> <span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="line-height: 2; font-size: 16px;">3.<span style="color:#333333;font-family:arial, "font-size:16px;background-color:#FBFBFB;"> Doors open frequently, and the intrusion of cold wind consumes a lot of heat.</span></span><br /> <span microsoft="" yahei";"="" font-size:16px;line-height:2;"="" style="line-height: 2; font-size: 16px;">4.<span style="color:#333333;font-family:arial, "font-size:16px;background-color:#FBFBFB;">The hangar is mainly used for airplane maintenance, therefore requiring more safety concerns.</span></span></span> </p> <p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span style="background-color:#FBFBFB;"><span style="font-size:16px;"><br /> </span></span><span font-size:16px;line-height:2;"=""><span style="line-height:2;font-size:16px;"><strong>Equipment Usage:</strong><span style="color:#333333;font-family:arial, "font-size:16px;background-color:#FBFBFB;">We have chosen 25 sets of IMPRESIND Tub-One gas-fired radiant heating products for this project. The project is currently under rapid construction. </span></span><span style="line-height:2;font-size:16px;"></span></span></span> </p> <p> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span font-size:16px;line-height:2;"=""><span style="font-size:16px;line-height:2;"><br /> </span></span></span> </p> <p style="text-align:center;"> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span font-size:16px;line-height:2;"=""><span style="font-size:16px;line-height:2;"><img src="http://www.leadwaypower.com/Uploads/image/20190418/20190418192223_65066.jpg" alt="" /><img src="http://www.leadwaypower.com/Uploads/image/20190418/20190418192223_60218.jpg" alt="" /><br /> </span></span></span> </p> <p style="text-align:center;"> <span microsoft="" yahei";="" font-size:="" 16px;="" line-height:="" 2.5;"="" 14px;="" 2;"="" font-size:14px;line-height:2;"=""><span font-size:16px;line-height:2;"=""><span style="font-size:16px;line-height:2;"><img src="http://www.leadwaypower.com/Uploads/image/20190426/20190426154226_98272.jpg" alt="" /></span></span></span> </p>
prev:China Southern Airlines Hangar Project at Daxing New Airport
Returns a list of
next:China Southern Airlines' New Hangar Project at Shenyang Airplane Maintenance Base